Water Treatment and Transmission Improvements Program

16 Documents in Project

Summary

SCH Number
2005092019
Lead Agency
East Bay Municipal Utility District (EBMUD)
Document Title
Water Treatment and Transmission Improvements Program
Document Type
NOD - Notice of Determination
Received
Posted
11/30/2007
Present Land Use
Public Roadway
Document Description
Includes new facilities and upgrades to existing facilities in Contra Costa County. In December 2006, the EBMUD Board of Directors approved the Water Treatment and Transmission Improvements Program (WTTIP) and certified an Environmental Impact Report (EIR) on the WTTIP. Since then, EBMUD has advanced the design of some WTTIP projects and is now proposing to modify the Moraga Road Pipeline. The purpose of the Moraga Road Pipeline is to provide additional treated water transmission capacity to portions of Moraga, Lafayette, and Orinda. The Moraga Road Pipeline alignment is approximately 3 miles long, extending between the Lafayette Water Treatment Plant in Lafayette and the Moraga/Draeger Drive intersection in the Town of Moraga. Consistent with CEQA, the SEIR evaluates environmental impacts associated with proposed changes in two locations along the proposed pipeline alignment. Between Old Jonas Hill Road in Lafayette and Sky-Hy Drive in Moraga construction of the project would require full closure of Moraga Road during construction hours for the pipeline segment from Nemea Court to Sky-Hy Drive. At the intersection of Rheem Boulevard and Moraga Road, open-trench construction (instead of bore-and-jack construction), with construction hours up to 24 hours per day, is now proposed.

Contact Information

Name
John Hurlburt
Agency Name
East Bay Municipal Utility District
Contact Types
Lead/Public Agency

Location

Cities
Lafayette, Moraga, Orinda
Counties
Contra Costa
Cross Streets
Miner Rd between Lombardy Ln and Tiger Tail Ct, Van Ripper Ln & Lombardy Ln
Zip
94563
Total Acres
1-5
Parcel #
various
State Highways
24
Railways
no
Airports
no
Schools
Sleepy Hollow ES
Waterways
Lauterwasser Creek

Notice of Determination

Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print