Upper San Leandro Water Treatment Plant Reliability Improvements - Addendum to the Water Treatment and Transmission Improvements Program (WTTIP) EIR

16 Documents in Project

Summary

SCH Number
2005092019
Lead Agency
East Bay Municipal Utility District (EBMUD)
Document Title
Upper San Leandro Water Treatment Plant Reliability Improvements - Addendum to the Water Treatment and Transmission Improvements Program (WTTIP) EIR
Document Type
NOD - Notice of Determination
Received
Posted
4/15/2021
Document Description
The Upper San Leandro Water Treatment Plant Reliability Improvements Project (Project) is one of many projects in the certified WTTIP EIR and includes ozone system upgrades, a new filter-to-waste equalization basin, and a new filter-to-waste pumping plant. During the detailed design, some changes to the original Project were identified. These Project changes include upgrades to the raw water control valve, flocculation system, sedimentation basin, washwater reclaim and solids handling system, chlorine contact basin, clearwell, and miscellaneous electrical, structural, civil, and security improvements In accordance with the California Environmental Quality Act, EBMUD completed an Addendum to the WTTIP EIR to address environmental impacts from the design changes. An evaluation was conducted and it was determined that the changes do not result in new significant impacts or cause an increase in the severity of previously identified impacts as presented in the certified WTTIP EIR. EBMUD will implement the same mitigation measures for the design changes that are presented in the WTTIP EIR. No further environmental documentation is required.

Contact Information

Name
Bill Maggiore
Agency Name
Lead Agency East Bay Municipal Utility District
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Oakland
Counties
Alameda
Regions
Northern California
Other Location Info
7770 Greenly Drive, Oakland, Alameda County (see attached map)

Notice of Determination

Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Alameda
Final Environmental Document Available at
East Bay Municipal Utility District, Office of the Secretary, Room 829, 375 Eleventh Street, Oakland, CA 94607

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print