Campus Child Care Center

3 Documents in Project

Summary

SCH Number
2005092017
Lead Agency
University of California
Document Title
Campus Child Care Center
Document Type
NOD - Notice of Determination
Received
Posted
12/12/2005
Present Land Use
The project would include changing the land use designation in the 2003 UC Davis Long Range Development Plan from Physical Education/Intercollegiate Athletics/Recreation to Student Housing to accommodate the proposed project.
Document Description
The Campus Child Care Center will develop a child care center consisting of a building with approximately 9,200 gross square feet and 10,710 square feet of play yards. The center would be a year-round childcare for approximately 95 infant through preschool-aged children. The Campus Child Care Center project also involves an amendment to the UC Davis 2003 Long Range Development Plan (LRDP) in order to change the land use designation of the site from its current designation as Physical/Education/Intercollegiate Athletics/Recreation to Student Housing, and land use designation which permits the development of the child care center.

Contact Information

Name
John E. Zimmermann
Agency Name
University of California Planning Design & Construction
Contact Types
Lead/Public Agency

Location

Cities
Davis
Counties
Yolo
Cross Streets
Extension Center Drive and Hutchison Drive
Zip
95616
Total Acres
0.5
State Highways
SR 113 and I-80
Railways
UPRR
Airports
University Airport
Schools
Davis Joint Unified
Waterways
Putah Creek
Township
8N
Range
2E
Section
16
Base
MDB&M

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print