Carmel River Reroute and San Clemente Dam Removal Project (Project), Lake and Streambed Alteration Agreement No. 1600-2013-0063-R4, Amendment No. 2
21 Documents in Project
Summary
SCH Number
2005091148
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Carmel River Reroute and San Clemente Dam Removal Project (Project), Lake and Streambed Alteration Agreement No. 1600-2013-0063-R4, Amendment No. 2
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2014
Present Land Use
Resource Conservation, permanent grazing, Mountain
Document Description
The California Department of Fish and Wildlife is issuing Amendment No. 2 to Lake and Streambed Alteration Agreement 1600-2012-0063-R4 to the Permittee, California Dam on the Carmel River in Monterey County. The Carmel River upstream of the existing San Clemente Dam will be rerouting trough a new, created channel. Amendment No. 2 includes changing the description of the access road bridge over Tularcitos Creek as a result of a change in design that includes a longer span; providing an alternative description of the temporary crossing over Tularcitos Creek used during permanent bridge construction; modifying the approval process for biologist to hand and relocate species of special concern; and allowing for excavation activity at night beyond what is authorized in the Agreement.
Contact Information
Name
Linda Connolly
Agency Name
Calfiornia Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Carmel-by-the-Sea
Counties
Monterey
Zip
93940
State Highways
Carmel Valley Road
Waterways
Carmel River
Township
17S
Range
2E
Section
24
Base
MDB&M
Other Location Info
Carmel Valley Village
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.