South Bay Boatyard Improvements

2 Documents in Project

Summary

SCH Number
2005091069
Lead Agency
San Diego, Port of
Document Title
South Bay Boatyard Improvements
Document Type
NOD - Notice of Determination
Received
Posted
12/12/2005
Present Land Use
Commercial Recreation, Promenade, Habitat Replacement and Specialized Berthing (Port Master Plan)
Document Description
The proposed improvements consist of site modifications, both on land and in the water, in-water improvements involve the construction of two steel or concrete fingers to support a Marine Travelift for large vessels and the removal of five floating docks. In-water modification would take place entirely within the boatyard's leased area that is protected by a wave attenuation wall and referred to as the "boat basin." Improvements on land involve general site improvements such as resurfacing and landscaping as well as the removal of up to seven existing buildings and placement of a new modular office building/workshop to replace an existing office building. All improvements would take place within the perimeter of the boat yard's lease.

Contact Information

Name
C.D. Magnus
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Location

Cities
Chula Vista
Counties
San Diego
State Highways
I-5
Waterways
San Diego Bay

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print