I-5 Far North

Summary

SCH Number
2005089084
Lead Agency
California Department of Transportation, District 12
Document Title
I-5 Far North
Document Type
NOD - Notice of Determination
Received
Posted
8/30/2005
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2005-0460-R5 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Mr. Son Nguyen of California Department of Transportation. The operator proposes to alter the streambed and bank by constructing a new high occupancy vehicle (HOV) lanes and also by constructing mixed flow lanes of 10.5 miles long in both directions of the I-5 freeway extending from the vicinity of SR-91 in Buena Park to the vicinity of Lakewood Boulevard in the city of Downey. Project activities on the North Bound (NB) of the I-5 include widening the bridge over Fullerton Creek, installing infill walls between the existing CISS Piles, and adding CISS Piles in order to support the proposed bridge widening. Project activities on the South Bound (SB) of I-5 include replacing the SB Bridge over Fullerton Creek and installing pier walls. The linear extent of the project within Fullerton Creek consist of 285'. On the NB side the proposed changes to the bridge will create an increase of 0.237 acres of coverage over Fullerton Creek, whereas along the SB side, the proposed increase in coverage over Fullerton Creek is 0.200 acres and the changes associated with the channel improvements will result in an increase of 32.268 square yards (0.007 acre) on the SB and 19.375 square yards (0.004 acre) along the NB. The operator shall not impact more than 0.448 acre of stream channel, of which 0.011 acre are permanent and 0.437 acre are temporary. All jurisdictional channels are entirely concrete lined at the proposed project site and no native riparian habitat shall be impacted as a result of the proposed project.

Contact Information

Name
Naeem Siddiqui
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Buena Park, Downey
Counties
Los Angeles, Orange

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print