Streambed Alteration Agreement 1600-2005-0098-3 / THP 1-04-234 SMO/SCR

Summary

SCH Number
2005089032
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement 1600-2005-0098-3 / THP 1-04-234 SMO/SCR
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2005
Document Description
The applicant proposes the following activities: one existing 30-inch diameter plastic culvert pipe will be replaced with a 36-inch diameter pipes sized for a 100-year storm event. The crossing is identified in the Timber Harvesting Plan as R16A. Replacement will be done in the late fall when surface flow is likely to be absent. If water is flowing, it will be impounded using a temporary dam of sand bags and piped around the construction. Two gravity-fed water diversions from Dresti Creek and Water Tank Creek to tanks through 3/4-inch diameter plastic pipes. No more than one 4,000 gallon load per day will be drawn from the tank. The projects are located at Pescadero Creek Tree Farm, 26800 Highway 9, Boulder Creek, California, T8S, R3W, sections 16, 17, 20, 21, 22, 27, and 28. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2005-0098-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Red Tree Properties, L.P. c/o James Greig Inc.

Contact Information

Name
Robert W. Floerke
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location


Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.