USDI, BOR - Buckhorn Dam Toe Drain Outfall Excavation Project

Summary

SCH Number
2005088043
Public Agency
Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa
Document Title
USDI, BOR - Buckhorn Dam Toe Drain Outfall Excavation Project
Document Type
NOE - Notice of Exemption
Received
Posted
8/3/2005
Document Description
Project involves the removal of 2-4 cubic yards of decomposed granite sediment. The accumulated sediments at the two toe drain outfalls, located immediately adjacent to the Buckhorn Dam Outlet works wingwalls, are preventing efficient discharge of water. This blockage compromises the safety of the dam. This one day project involves excavation by a rubber-tired backhoe and transport of excavated material to a spoil area. The spoil area is located in a naturally occuring shallow depression.

Contact Information

Name
Catherine Woody
Agency Name
Regional Water Quality Control Board, Region 1 (North Coast), Sa
Contact Types
Lead/Public Agency

Location

Counties
Trinity
Other Location Info
Douglas City

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301
Reasons for Exemption
The project consists of repair, maintenance, and minor alteration of an existing facility.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print