Vineyard Market Square Project
25 Documents in Project
Summary
SCH Number
2005082045
Lead Agency
Sacramento County
Document Title
Vineyard Market Square Project
Document Type
NOD - Notice of Determination
Received
Posted
10/16/2018
Present Land Use
AG-20, AG-20(F), AG-80, A-10, AR-10, AR-10(F), AR 1-2, AR 2-5, BP, GC, IR(F), IR (SM), LC, M-1, M-1(F), M-1(SM), OS, RM-1, RD-10(MHP), OS, RM-1, RD-10, RD-10(MHP), RD 2-3, RD 3-5, RD 5-7, RD 7-12, RD-20, SC / Agricultural-Urban Reserve, Agricultural-Urban Reserve-Aggregate Resource Area, General Agriculture (20 acres), General Agriculture (20 acres)-Aggregate Resource Area, Intensive Industrial, Low Density Residential, Recreation, Urban Development Area.
Document Description
The Central Valley Regional Water Board is issuing a 401 Water Quality Certification for the subject project. The 36.9-acre Project consists of mass grading in preparation for the construction of a mixed-use community comprised of commercial and multi-family residential units. Approximately 3,198 cubic yards of clean soil will be used to fill 0.938 acres of seasonal wetlands. In addition, approximately 0.053 acre/1,160 linear feet of drainage ditch will be re-routed into a 24-inch pipe and connected to a county to a county storm drain system on Elk Grove-Florin Rd.
Contact Information
Name
Peter Minkel
Agency Name
Central Valley Regional Water Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Total Acres
3,766
Parcel #
Various
State Highways
99
Railways
Central California Traction Co.
Airports
Mather
Schools
Sierra Enterprise, Merryhill Country, Kirchgater, Jackson, Tsuka
Waterways
Florin Creek
Township
8N
Range
5E
Section
31,36
Base
MD
Other Location Info
South Sacramento and Vineyard communities
Other Information
Carmichael, Florin, Elk Grove, East Sacramento
Notice of Determination
Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.