Elkhorn Boulevard Extension Project

17 Documents in Project

Summary

SCH Number
2005082017
Lead Agency
Sacramento County
Document Title
Elkhorn Boulevard Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
3/8/2022
Document Description
The project is limited to the alignment extension of Elkhorn Boulevard from Metro Air Park to Airport Boulevard, totaling a length of approximately 5,900 linear feet. The alignment extension includes various infrastructure improvements including a roundabout at Crossfield Drive, a 32-acre detention basin in the eastern portion of the site, a new traffic signal at the intersection of Power Line Road and Elkhorn Boulevard, surface improvements and a wet utility connection. Project activities include the two culverts, a stormwater tie-in, and grading activities associated with the road extension.

Contact Information

Name
Dylan Wood
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Sacramento
Regions
Northern California
Parcel #
201-0291-020-6000
Other Location Info
The project area is generally bordered by Power Line Road to the east, Airport Boulevard to the west, Meister Way to the north, and Interstate 5 to the south.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of execution of the above Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print