Sacramento International Airport Master Plan Update

17 Documents in Project

Summary

SCH Number
2005082017
Lead Agency
Sacramento County
Document Title
Sacramento International Airport Master Plan Update
Document Type
FIN - Final Document
Received
Document Description
The proposed project is the Sacramento International Airport (SMF) Master Plan Update. The Master Plan Update revises the existing program for modifications of existing facilities and development of new facilities at SMF through the year 2040. The Master Plan addresses all aspects of the airport including the airfield, terminals and related passenger services, cargo, general aviation (GA), airport support, airport access and commercial development. The update largely consists of revisions to proposed airport projects and facilities based on revised aviation forecasts. The update looks at previously identified projects and projected growth at SMF. Many of the updates center on the timing of the project (planning phase) along with minor changes to locations and size of facilities. A direct comparison of the Master Plan and MPU facilities and planning phasing are presented in Table PD-1 and MPU exhibits are presented in Plate PD-3 through 7; notable changes are highlighted below: • Removal of the third runway and taxiway system; • Relocating the economy parking lot from south of I-5 to north of I-5, east of Airport Boulevard; • Changing the economy parking lot south of I-5 to commercial uses and moving it to PAL 4; • Changing the location of Elkhorn Boulevard extension; • Construction of a third Concourse, adjacent to Concourse B; • Construction of new airline maintenance, rehabilitation and overall MRO facilities; • Construction of a new consolidated rental car facility; • Revising the acreage, location and phasing of the commercial development proposed north of I-5; and • Movement of the new cargo building and apron from the southwest side to the north airfield, east of Runway 16R and increasing the size from 226k thousand square feet (kft2) to 950kft2. -The Cargo Facility is comprised of three buildings (sortation building, a ground crew building, and an equipment maintenance building), associated parking, and a taxilane on 192 acres on the north side of the airport (Plate PD-8). As shown on the conceptual plan, the three buildings would total 950,000 square feet, have 13 aircraft parking spacesd, 1,314 parking spaces, and 343 trailer parking spaces. Access to the project site is provided on Earhart Drive from West Elverta Road. Intersection improvements for Earhart Drive and West Elverta Road, which include widening and signalization, are proposed as part of this project

Contact Information

Name
Joelle Inman
Agency Name
Sacramento County Planning
Job Title
ENVIRONMENTAL COORDINATOR
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Parcel #
201-240-038

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Habitat Conservation Planning (CDFW), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality
Development Types
Industrial (Airport facilities)(Sq. Ft. 950, Acres 77, Employees 1)
Local Actions
Airport Master Plan
Project Issues
Agriculture and Forestry Resources, Air Quality, Drainage/Absorption, Flood Plain/Flooding, Hydrology/Water Quality, Noise, Public Services, Transportation, Climate Change
Local Review Period Start
Local Review Period End

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.