Under Ocean Floor Seawater Intake and Discharge Project

2 Documents in Project

Summary

SCH Number
2005081160
Lead Agency
City of Long Beach
Document Title
Under Ocean Floor Seawater Intake and Discharge Project
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2005
Present Land Use
The City of Long Beach General Plan designates the proposed project site as Open Space/Park. Z: The City of Long Beach zoning designation for the site is "P", or Park.
Document Description
The Under Ocean Floor Seawater Intake and Discharge Project, proposed by the Long Beach Water Department (LBWD), is intended to determine the feasibility of utilizing a system of subsurface intake and discharge wells for seawater desalination. If determined feasible, this subsurface intake and discharge system can be an alternative to the widely-proposed method of utilizing a coastal power plant's existing once-through cooling water system for seawater desalination.

Contact Information

Name
Jill Griffiths
Agency Name
City of Long Beach
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Cross Streets
Near southern terminus of Junipero Road
Zip
90803
Parcel #
7264-019-909
State Highways
1
Schools
Burbank ES, Mann ES, Franklin MS, Stevenson ES
Waterways
Pacific Ocean
Township
5S
Range
12W
Section
5, 6
Base
SBBM

Notice of Determination

Approving Agency
City of Long Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes