Silvergate Transmission Substation Project - CPCN Application No. 05-03-024

5 Documents in Project

Summary

SCH Number
2005081106
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Silvergate Transmission Substation Project - CPCN Application No. 05-03-024
Document Type
NOD - Notice of Determination
Received
Posted
9/13/2006
Present Land Use
Local Business / Commercial / Residential / Military
Document Description
SDG&E is proposing to replace the aging 139/69 kV Main Street Substation with a new 230/69 kV substation (Silvergate). The new Silvergate Substation would be located across the street from the existing Main Street Substation on SDG&E owned property and on adjoining property in the Barrio Logan community in the City of San Diego. In addition, SDG&E is proposing two associated projects: installation of a Special Protection System at transmission substations dispatching power from the South Bay Power Plant and 138 kV line undergrounding and removal of lattice steel bridge structures located within the SDG&E's right-of-way between South Bay Power Plant and the Sweetwater River.

Contact Information

Name
Jensen Uchida
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Cities
Chula Vista, National City, San Diego
Counties
San Diego
Cross Streets
Sampson Drive, Harbor Drive, San Diego, Bay Blvd, Chula Vista
Zip
Multiple
Parcel #
Multiple
State Highways
I-5, I-805, SR-54
Railways
SDIV RR
Airports
S.D. Lindberg Field, US MCAS
Schools
Chula Vista ES, Sweetwater UHS, San Diego USD
Waterways
Sweetwater River
Township
Multi.
Section
Multi.
Base
Multiple

Notice of Determination

Approving Agency
California Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.