Mae Boyar Playground Upgrades

Summary

SCH Number
2005078414
Public Agency
Rancho Simi Recreation and Park District
Document Title
Mae Boyar Playground Upgrades
Document Type
NOE - Notice of Exemption
Received
Posted
7/29/2005
Document Description
The existing playground at Mae Boyar Park was installed in 1988. It consists of a tot structure, preteen structure, swings, and tot spring animals. The 17-year-old structure does not meet either current Consumer Projects Safety of the Americans with Disabilities Act standards. Due to the structure's age, replacement parts are unavailable, resulting in several of the play elements having to be modified or abandoned. The existing 5,000 sq. ft. playground is located between the park's recreation building and the tennis courts. Due to fall zone requirements, the playground will be relocated slightly to the north (approximately 30 feet), next to three existing picnic tables and surrounded by several mature trees. The upgraded 4,880 sq. ft. playground will consist of a tot structure, preteen structure, swings and tot spring animals. As part of the project, one ash tree which is currently in a state of decline will be removed. Also as a part of the project, the existing playground will be irrigated, and turf and three trees added. Additionally, five trees will be added around the new playground structure.

Contact Information

Name
Ed Hayduk
Agency Name
Rancho Simi Recreation and Park District
Contact Types
Lead/Public Agency

Location

Counties
Ventura
Other Location Info
City: Oak Park

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301
Reasons for Exemption
(1) The proposed playground upgrades provide for the maintenance and minor improvement of an existing playground in a recreation area owned by the Rancho Simi Recreation and Park District. (2) The proposed playground upgrades will provide playground equipment that meets current standard of public health and safety. (3) The proposed playground upgrades will consist of the same elements as the existing playground structure: a tot structure, preteen structure, swings, and tot spring animals. (4) The proposed playground upgrades involve negligible or no expansion of an existing use. The existing playground occupies 5,000 sq. ft., while the playground upgrades will occupy 4,880 sq. ft., and the playground structures consist of the same elements.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print