Mariner Walk Development (Project Reference No. AP-04-126)
2 Documents in Project
Summary
SCH Number
2005072109
Lead Agency
City of Pittsburg
Document Title
Mariner Walk Development (Project Reference No. AP-04-126)
Document Type
NOD - Notice of Determination
Received
Posted
10/17/2005
Present Land Use
Downtown Medium Density Residential, Downtown Low Density Residential, Park
Document Description
Mariner Walk is a residential development project consisting of 123 detached, single-family clustered units with common private driveways and a 0.95-acre improved and privately-maintained linear parkway. The project would require relocation of an existing five-acre public park from the northwestern corner of the property to a 3.45-acre site at location near the Eighth Street linear park and make the current park site available for residential construction. The project required approval of: (1) a disposition and development agreement between the City, Redevelopment Agency and the project proponent; (2) amendment to the Land Use Element, Downtown Element and Open Space, Youth and Recreation Element of the General Plan; (3) approval of a PD (Planned Development) zoning district for the property; (4) approval of a vesting tentative map (Tract No. 8869) to subdivide the property in order to create 123 single-family cluster lots, and separate parcels for the linear park, on-site detention pond, relocated public park and Delta Diablo Sanitation District pump station; and (5) design review approval of preliminary landscaping plans and architectural plans for the proposed residential units.
Contact Information
Name
Dana Hoggatt
Agency Name
City of Pittsburg
Contact Types
Lead/Public Agency
Phone
Location
Cities
Pittsburg
Counties
Contra Costa
Cross Streets
Herb White Way and West Eight Street
Zip
94565
Total Acres
15.6
Parcel #
Various
State Highways
4
Railways
BNSF
Schools
St. Peter Marter
Notice of Determination
Approving Agency
City of Pittsburg
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.