Yarbrough Southport Project (Lake or Streambed Alteration Agreement No. EPIMS-YOL-16982-R3)

4 Documents in Project

Summary

SCH Number
2005072101
Lead Agency
City of West Sacramento
Document Title
Yarbrough Southport Project (Lake or Streambed Alteration Agreement No. EPIMS-YOL-16982-R3)
Document Type
NOD - Notice of Determination
Received
Posted
3/9/2023
Document Description
The project is limited to the installation of four (4) 60-inch storm drain outfalls into the Main Drain Canal. The outfalls will be of identical design, consisting of a 60-inch reinforced concrete pipe with concreted rock slope protection beginning at the midpoint of the outfall. Loose rock slope protection below the concreted rock slope protection will be backfilled with native soil.

Contact Information

Name
Andrea Boertien
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
West Sacramento
Counties
Yolo
Regions
Northern California, San Francisco Bay Area
Other Location Info
This project is located in the Main Drain Canal, next to the Sacramento Deep Water Ship Channel, in the County of Yolo, State of California at the following locations: 1. Outfall A: Latitude 38.51890, Longitude -121.56430; Assessor’s Parcel Number (APN): 045-230-004 2. Outfall B: Latitude 38.51650, Longitude -121.57780; APN: 046-190-002 3. Outfall C: Latitude 38.51580, Longitude -121.57950; APN: 045-230-018 4. Outfall D: Latitude 38.51620, Longitude -121.56820; APN: 046-190-003

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Yolo
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print