Defender Grade Road Left Turn Lane (10-AMA-88-PM 29.5)

3 Documents in Project

Summary

SCH Number
2005072028
Lead Agency
Caltrans 10 (Stockton) (California Department of Transportation, District 10)
Document Title
Defender Grade Road Left Turn Lane (10-AMA-88-PM 29.5)
Document Type
NOD - Notice of Determination
Received

Document Description
Caltrans proposes to build a standard 12-foot-wide continuous left-turn lane and standard 8-foot-wide highway shoulders at and near the intersection of State Route 88 and Defender Grade Road, located in Amador County in the community of Pioneer. The purpose of the proposed project is to reduce the number of accidents at and improve the safety and operation of the State Route 88/Defender Grade Road intersection, Route 88 would be widened equally on both sides to accommodate the left-turn lane and standard shoulders. Drainage facilities would be modified and utilities would be relocated. Strips of new right-of-way would be acquired from a total of 10 parcels.

Contact Information
Kathy Ikeda
Department of Transportation, District 10
1976 E. Charter Way/Martin Luther King, Jr. Blvd.
Stockton, CA 92505

(209) 948-3825

Location

Counties
Amador
Cross Streets
Defender Grade Road, Pioneer Creek Road
Zip
95666
Total Acres
1.6
Parcel #
31-05-10, 31, 36, 38, 39, 40; 31-07-09, 10, 12
State Highways
88 and 26
Schools
Pioneer ES
Waterways
South Fork Sutter Creek, North Fork Mokelumne River, Pioneer Creek
Township
7N
Range
13E
Section
29
Base
MD
Other Location Info
City/Nearest Community: Pioneer

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
California Department of Transportation

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search