A Revised Full Solid Waste Facilities Permit No. 30-AB-0360

13 Documents in Project

Summary

SCH Number
2005071102
Lead Agency
Orange County
Document Title
A Revised Full Solid Waste Facilities Permit No. 30-AB-0360
Document Type
NOD - Notice of Determination
Received
Posted
8/22/2008
Present Land Use
Public Facilities / Landfil Site (4(LS)) and County of Orange Zoning designation - Public Facilities
Document Description
Set the maximum permitted tonnage to 11,500 tons per day; increase the disposal acreage from 341 acres to 534 acres; increase airspace capacity to 266,000,000 cubic yards; increase Maximum Waste Elevation from 1100 feet above mean sea level to 1350 feet above mean sea level; increase Maximum Waste Depth from 410 feet to 640 feet; increase the estimated life of the landfill from 2022 to 2053 and change the name of the owner and operator.

Contact Information

Name
Raymond Seamans
Agency Name
California Integrated Waste Management Board
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
Sand Canyon Avenue and Portola Parkway
Zip
92602
State Highways
SR 133 and SR 241
Airports
Marine Corps Air Station El Toro
Township
5S
Range
8W
Section
118,
Base
El Toro
Other Information
Section: 143, 144 Airports: (decommissioned/no longer operating)

Notice of Determination

Approving Agency
California Integrated Waste Management Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print