Foothill Feeder Repair and Future Inspections Project, Supplemental EIR

8 Documents in Project

Summary

SCH Number
2005071082
Lead Agency
Metropolitan Water District of Southern California
Document Title
Foothill Feeder Repair and Future Inspections Project, Supplemental EIR
Document Type
NOD - Notice of Determination
Received
Posted
1/19/2006
Present Land Use
The Land Use Policy Map of the Santa Clarita Valley Area Plan designates the Foothill Feeder pipeline alignment as right-of-way (both permanent easement and fee property) with a land use designation of Public Facilities within the unincorporated areas of Los Angeles County. In the City of Santa Clarita, the Foothill Feeder pipeline alignment is designated as right-of-way (both permanent easement and fee property) with land use designations of RE (Residential Estate), RL (Residential Low), CC (Community Commercial), RM (Residential Moderate), RS (Residential Suburban), and OS (Open Space).
Document Description
The Foothill Feeder is a 201-inch diameter prestressed concrete cylinder pipeline (PCCP) that was constructed in 1968 and conveys water to the Sepulveda, West Valley and East Valley Feeders serving the Central Pool and western portions of Metropolitan's service area. Electromagnetic inspections performed in March 2005 revealed three distressed pipe sections with up to 70 prestressing wire breaks. Pipe sections with this level of distress warrant prompt repair. Based on the locations of the damaged segments and their condition, two different repair methods will be used. For the first repair (Foothill Feeder Carbon Fiber Liner Repair Project), carbon filter lining will be used to internally reinforce two distressed pipe segments. For the second repair (Foothill Feeder Pipeline Replacement Project), one "broken back" pipe segment will be removed and replaced with a 20-foot section of steel pipe. These activities would require a complete shutdown and dewatering of the Foothill Feeder pipeline. The EIR also discusses additional periodic shutdowns to allow for future inspections and maintenance activities.

Contact Information

Name
Marty Meisler
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
Valencia Blvd. / Decoro Ave., Valencia Blvd. / McBean Pkwy., San Fernando Rd / Placerita Canyon
Total Acres
17.8
State Highways
14
Railways
Union Pacific / Metrolink
Schools
Valencia HS
Waterways
Santa Clara River, Bull Creek, Placerita Creek, San Francisquito Creek, Charlie Canyon Creek, Ca
Other Information
Cross Streets: Road, San Fernando Rd. / Railroad Avenue. Waterways: Castaic Creek.

Notice of Determination

Approving Agency
Metropolitan Water District of Southern California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print