Foothill Feeder Repair and Future Inspections Project, Supplemental EIR

8 Documents in Project

Summary

SCH Number
2005071082
Lead Agency
Metropolitan Water District of Southern California
Document Title
Foothill Feeder Repair and Future Inspections Project, Supplemental EIR
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
The Land Use Policy Map of the Santa Clarita Valley Area Plan designates the Foothill Feeder pipeline alignment as right-of-way (both permanent easement and fee property) with a land use designation of Public Facilities within the unincorporated areas of Los Angeles County. In the City of Santa Clarita, the Foothill Feeder pipeline alignment is designated as right-of-way (both permanent easement and fee property) with land use designations of RE (Residential Estate), RL (Residential Low), CC (Community Commercial), RM (Residential Moderate), RS (Residential Suburban), and OS (Open Space).
Document Description
The Metropolitan Water District of Southern California (Metropolitan) conducted an inspection of the Foothill Feeder pipeline in February 2005. The inspections revealed three prestressed concrete cylinder pipe sections that require repairs. Metropolitan is proposing to conduct repairs of these three sections. Two of these sections will be repaired internally using carbon fibers. The third section of pipe will be removed and replaced through an open trench. Metropolitan is also proposing to conduct future electromagnetic inspections and related maintenance activities of the Foothill Feeder on a five-year cycle. These activities will require complete shutdown and dewatering of the Foothill Feeder pipeline; the first shutdown is scheduled to occur in February 2006.

Contact Information

Name
Marty Meisler
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
Valencia Blvd. / Decoro Ave., Valencia Blvd. / McBean Pkwy., San Fernando Rd / Placerita Rd, San
Total Acres
17.8
State Highways
14
Railways
Union Pacific / Metrolink
Schools
Valencia HS
Waterways
Santa Clara River, Bull Creek, Placerita Creek, San Francisquito Creek, Charlie Canyon Creek, Ca
Other Information
Cross Streets: San Fernando Rd. / Railroad Avenue. Waterways: Castaic Creek.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Quality, California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
Development Types
Water Facilities (Repairs)(Type Inspections & Re)
Project Issues
Aesthetics, Air Quality, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hydrology/Water Quality, Land Use/Planning, Noise, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print