Whitewater River/Coloardo River Aqueduct SIphon Scour Protection Project (Lake or Streambed Alteration Agreement No. 1600-2015-0257-R6)
5 Documents in Project
Summary
SCH Number
2005071069
Lead Agency
Metropolitan Water District of Southern California
Document Title
Whitewater River/Coloardo River Aqueduct SIphon Scour Protection Project (Lake or Streambed Alteration Agreement No. 1600-2015-0257-R6)
Document Type
NOD - Notice of Determination
Received
Posted
10/18/2016
Present Land Use
Business & Manufacturing Park; Public Facilities and Residential Conservation
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0257-R6), pursuant to section 1602 of the Fish and Game Code to the project Applicant, the Metropolitan Water District of Southern CA.
Project is limited to the replacement of the existing concrete apron with a 25-foot wide concrete slab, construction of a grade control/drop structure, replacement of the existing earthen berms on the eastern and western side of the concrete slab with a gabion-faced berms within and adjacent to the active channel of the Whitewater River at the existing Colorado River Aqueduct (CRA) Whitewater Siphon.
Contact Information
Name
Charles Land
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Desert Hot Springs
Counties
Riverside
Cross Streets
I-10/Whitewater Canyon Rd, Esperanza Ave/Orange St, Carmen Ave/Elm St
Zip
92282/30
Total Acres
110
Parcel #
various
State Highways
I-10
Railways
UPRR
Waterways
Whitewater River, San Gorgonio River
Township
3S
Range
2E
Section
14,20
Base
SBB&M
Other Location Info
Nearest Community: Cabazon
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.