State Route 1 Salinas Road Interchange Project - Agreement 2008-0181-R4

6 Documents in Project

Summary

SCH Number
2005071059
Lead Agency
California Department of Transportation, District 5
Document Title
State Route 1 Salinas Road Interchange Project - Agreement 2008-0181-R4
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2008
Present Land Use
Agricultural Preservation, Agricultural Conservation, Agricultural Industrial
Document Description
Dept. of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Sec. 1602 of the Fish and Game Code to the project applicant. Caltrans proposes to replace and extend a culvert for a blue line drainage that is fed by agricultural irrigation, but does connect to Elkhorn Slough. The current culvert is a 24" diameter by 75ft. long corrugated metal pipe, which will be replaced with a 36" diameter culverts (either concrete or plastic) and extended another 260ft. to accommodate the new frontage road and north bound off-ramp. The ditch may need to be widened slightly to allow for the increased diameter and seven willows at the inlet would need to be removed. Rock Slope Protection (RSP) would be placed at the inlet and outlet to reduce erosion.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Monterey
Cross Streets
Highway 1 and Salinas Road
Total Acres
33-37
State Highways
1
Schools
Ohlone ES, 21 Bay Farms Road, Watsonville
Waterways
Pajaro River and Elkhorn Slough
Other Location Info
City: Castroville

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print