Aliso Niguel High School Addition of Portable Classrooms

3 Documents in Project

Summary

SCH Number
2005071025
Lead Agency
Capistrano Unified School District (CUSD)
Document Title
Aliso Niguel High School Addition of Portable Classrooms
Document Type
NOD - Notice of Determination
Received
Posted
8/9/2005
Present Land Use
The General Plan designation for the project site is Community Facility and the zoning designation is Agriculture/Green belt. The project site is developed with an existing public high school. The school is bordered by residential uses to the north and west, Foxborough Elementary to the east, and Open Space on the southern boundary of the property.
Document Description
The proposed project involves the addition of no more than 10 portable classrooms to San Clemente High School. This addition is necessary to accommodate the existing and anticipated student population. The former Ole Hanson Elementary School campus is part of the high school campus and is referred to as the "Upper Campus". The addition of 10 portables would require a minimum amount of site preparation, consisting of a minor amount of grading and trenching for utilities. The portable classrooms will be added incrementally, as necessary, with the first two portables being placed on the Upper Campus during the summer of 2005. Future additions, if required, will be made based on actual student enrollment.

Contact Information

Name
Cary Brockman
Agency Name
Capistrano Unified School District
Contact Types
Lead/Public Agency

Location

Counties
Orange
Cross Streets
Wolverine Way and Deerhurst
Total Acres
45
State Highways
SR 73
Schools
Foxborough ES, Wood Canyon ES, Canyon Vista ES, Laguna Niguel ES
Waterways
Aliso Creek
Other Location Info
City: Aliso Viejo 28000 Wolverine Way
Other Information
Schools: Oak Grove ES

Notice of Determination

Approving Agency
Capistrano Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes