Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0182-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sutter County Public Works Department.
Sutter County proposes to construct a small-craft boat-launching facility that would include a 35 vehicle/trailer parking lot approximately 200 feet wide x 1,400 feet long, a 180' x 16-20 concrete boat ramp extending from the edge of the parking lot into the River, and a lockable public access gate. Construction access to the site would be via an existing dirt/gravel road at the south end of the Tisdale Weir/Bridge. Erosion and pollution control measures (i.e. riprap) shall be installed along the bank of the River immediately north of the proposed ramp to alleviate an existing erosion problem along the riverbank.
Contact Information
Name
Gary L. Hobgood
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sutter
Other Location Info
Sacramento River at the Tisdale weir
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.