Interconnection, Grid Effects and Tariff Design for DER
Summary
SCH Number
2005068495
Public Agency
California Energy Commission
Document Title
Interconnection, Grid Effects and Tariff Design for DER
Document Type
NOE - Notice of Exemption
Received
Posted
6/29/2005
Document Description
The overall purpose of this project is to co-fund research with the DOE through NREL to develop processes, standards, and technology for the purposes of integrating Distributed Energy Resources into California's electrical distribution system and marketplace. Technologies fabricated and field tested will be done at existing facilities.
Contact Information
Name
Bernard Treanton
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency
Phone
Location
Other Location Info
Golden, CO
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Section 15306
Reasons for Exemption
Class 6 - Basic data collection, research, experimental management, and resource evaluation activities that do not result in major disturbances to an environmental resource.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.