Maintenance Dredging at Berkeley Marina Docks H and I

Summary

SCH Number
2005068408
Public Agency
Regional Water Quality Control Board, Region 2 (San Francisco Bay), Oakland
Document Title
Maintenance Dredging at Berkeley Marina Docks H and I
Document Type
NOE - Notice of Exemption
Received
Posted
6/27/2005
Document Description
The project involves dredging approximately 250 cubic yards of sediment for slope stabilization at the toe of the existing rock-armored shoreline slope between docks H and I. The project depth for the dredging portion is -8 feet Mean Lower Low Water (MLLW). The dredged material will be removed from the landside by crane or drag line and either reused for construction fill onsite or disposed of at a permitted landfill or at another upland location approved by the Water Board.

Contact Information

Name
Elizabeth Christian
Agency Name
Regional Water Quality Control Board, Region 2 (San Francisco Ba
Contact Types
Lead/Public Agency

Location

Cities
Berkeley
Counties
Alameda

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15304
Reasons for Exemption
Project consists of maintenance dredging where the dredged material is deposited in a disposal area authorized by all applicable state and federal agencies, as described in Section 15304(g).

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print