Dobbins Street / Monte Vista Avenue Intersection and Bridge Widening

3 Documents in Project

Summary

SCH Number
2005062166
Lead Agency
City of Vacaville
Document Title
Dobbins Street / Monte Vista Avenue Intersection and Bridge Widening
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2005
Present Land Use
Dobbins Street (Collector Street south of MV Avenue; Major Arterial north of MV Avenue); Monte Vista Avenue (Major Arterial); Ulatis Creek (CF - Community Facility)
Document Description
The City of Vacaville Public Works Department is proposing to widen the existing Monte Vista Avenue Bridge over Ulatis Creek on both its north and south sides from the current width of 62 feet wide to a maximum width of 92 feet. The widening will include a maximum of 13 feet on the south side and a maximum of 18 feet on the north side, including a new crash rail. Construction will involve the placement of wing walls, pier walls, and pile caps beyond their current locations, and additional piles within Ulatis Creek. Construction activities within Ulatis Creek will include the installation of rock slope protection to stabilize creek banks, and the channel in the bridge zone to eliminate erosion potential within the Ulatis Creek channel. Project construction will also include several street improvements at the Dobbins Street / Monte Vista Avenue intersection.

Contact Information

Name
Erika S. Jackson
Agency Name
City of Vacaville
Contact Types
Lead/Public Agency

Location

Cities
Vacaville
Counties
Solano
Cross Streets
Dobbins Street / East Monte Vista Avenue
Zip
95688
Parcel #
N/A (street intersection)
Schools
Ulatis ES, Victorville HS
Waterways
Ulatis Creek

Notice of Determination

Approving Agency
Vacaville City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print