Oselot-Baroque Substation and Line Project
6 Documents in Project
Summary
SCH Number
2005062073
Lead Agency
Sacramento Municipal Utility District
Document Title
Oselot-Baroque Substation and Line Project
Document Type
NOD - Notice of Determination
Received
Posted
10/16/2020
Document Description
The proposed project would revise a portion of the original approved project's 69-kV subtransmission line route alignment. This would include relocating the subtransmission line from the west side of the Folsom South Canal to the east side of the Folsom South Canal from International Drive to Douglas Road; and then continuing east along the north side of Douglas Road for approximately 2,200 feet before crossing Douglas Road to make a connection to an existing radial 69-kV line. Also included is the connection to the future Oselot substation located at 3435 Oselot Way. The project is a critical component needed to energize the future Oselot-Baroque substation, and to meet the demand for electric service in the City of Rancho Cordova and surrounding area.
Contact Information
Name
Jerry Park
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Email
Name
Agency Name
Sacramento Municipal Utility District
Contact Types
Project Applicant
Location
Cities
Rancho Cordova
Counties
Sacramento
Cross Streets
Zinfandel Drive, Sunrise Boulevard, International Drive and Douglas Road
Other Location Info
The project site is located within the City of Rancho Cordova within the boundaries of Zinfandel Drive, Sunrise Boulevard, International Drive and Douglas Road. The proposed 2.4-mile overhead 69-kV subtransmission line would parallel the Folsom South Canal on the east, along U.S. Bureau of Reclamation property and north of Douglas Road for approximately 2,200 feet before crossing to the south side of Douglas Road to an existing radial 69-kV line located approximately 450 feet west of the intersection of Sunrise Boulevard and Douglas Road.
Notice of Determination
Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.