Garberville Sanitary District Treatment Plant Improvement
4 Documents in Project
Summary
SCH Number
2005062051
Lead Agency
Garberville Sanitary District
Document Title
Garberville Sanitary District Treatment Plant Improvement
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2008
Present Land Use
Unclassified, Agriculture Exclusive, Public Facilities, Agriculture Rural
Document Description
The project consists of the addition of one new 100' by 700' treatment pond to the existing set of 3 treatment ponds and conversion of the chain of ponds from the existing "standard" treatment technology (facultative system utilizing oxidation/stabilization) to a "constructed wetlands" treatment technology (a "biomass" treatment technology utilizing biogeochemical activity, settling and absorption). The project also includes the construction of a new 2,800 sf District Operations building, implementation of various technical studies, and installation of a new ultraviolet disinfection system and the conversion of the two percholation ponds into an engineered infiltration gallery.
Contact Information
Name
Carolyn Ornich
Agency Name
Garberville Sanitary District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Humboldt
Cross Streets
Bear Canyon Road
Zip
95542
Total Acres
~ 26.55
Parcel #
223-061-12
State Highways
101
Airports
Garberville Airport
Waterways
South Fork Eel River
Township
4S
Range
3E
Section
24
Base
Humboldt
Other Location Info
City: Garberville
Notice of Determination
Approving Agency
Board of Directors of the Garberville Sanitary District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.