Blue Jay Lane Bridge Replacement at Anderson Creek
3 Documents in Project
Summary
SCH Number
2005062045
Lead Agency
Shasta County
Document Title
Blue Jay Lane Bridge Replacement at Anderson Creek
Document Type
NOD - Notice of Determination
Received
Posted
3/1/2006
Present Land Use
Agricultural and Rural Residential
Z: Agricultural
GP: Agricultural
Document Description
Replace the existing two-span, 39-foot long by 17-foot wide Blue Jay Lane Bridge over Anderson Creek with a new four-span 154-foot long by 22-foot wide bridge. The specific alignment for the new bridge has not yet been determined. The new bridge will either be on approximately the same horizontal alignment or constructed immediately downstream and south of the existing bridge. The new bridge will be approximately two feet higher. The proposed project will require approximately one acre of new right-of-way and may involve the relocation of existing overhead power lines. Two detour options are being considered depending on final bridge design: either the existing bridge will remain open until the new bridge is complete at which time the old bridge, approaches and piers will be demolished and removed; or, a detour utilizing an existing farm road, running from Ash Creek Road north a point on Blue Jay Lane immediately east of bridge, will be graveled and maintained as a detour until the new bridge is open to traffic.
Contact Information
Name
Dan Little
Agency Name
Shasta County Department of Public Works
Contact Types
Lead/Public Agency
Phone
Location
Counties
Shasta
Cross Streets
Blue Jay Lane / Balls Ferry Road
Zip
96022
Total Acres
~ 2
Waterways
Anderson Creek and Sacramento River
Township
30N
Range
3W
Section
59 PBR
Base
MDBM
Other Location Info
NE of Cottonwood
Other Information
Section: Grant
Notice of Determination
Approving Agency
Shasta County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A