Westgate Pasadena

3 Documents in Project

Summary

SCH Number
2005061177
Lead Agency
City of Pasadena
Document Title
Westgate Pasadena
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2006
Present Land Use
CD Central District Zone, Subdistrict CD-1
Document Description
The applicant, Sares-Regis Group, is requesting entitlements to allow construction of a new urban village encompassing three contiguous blocks with 820 residential units and approximately 22,154 square feet of ground floor retail with 1,693 underground parking spaces. The project is intended to be transit-oriented because of its proximity (two to five blocks) to Metro Gold Line stations. A Transit-Oriented Development (TOD) is a development, located within walking distance of a major transit stop designed for pedestrians without excluding motor vehicles. Transit-oriented development can be new construction or redevelopment of one or more structures whose design and orientation facilitate transit use. The proposed project including building heights, setbacks, and street improvements is consistent with the Central District Specific Plan (CDSP).

Contact Information

Name
Robert Avila
Agency Name
City of Pasadena
Contact Types
Lead/Public Agency

Location

Cities
Pasadena
Counties
Los Angeles
Cross Streets
Green Street, DeLacey Avenue, Del Mar Boulevard, Pasadena Avenue
Zip
91106
Total Acres
11.94
Parcel #
Multiple
State Highways
710, 210
Railways
Metro Gold Line
Schools
Several within Pasadena USD
Waterways
Arroyo Seco Flood Control Channel

Notice of Determination

Approving Agency
City of Pasadena
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print