Lake Overflow and Connection Project Job 97025

2 Documents in Project

Summary

SCH Number
2005061113
Lead Agency
Padre Dam Municipal Water District
Document Title
Lake Overflow and Connection Project Job 97025
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2005
Present Land Use
Santee Lakes Recreation Preserve is operated by Padre Dam Municipal Water District under an existing Conditional Use Permit issued by the City of Santee.
Document Description
The Lake Overflow and Connection Project is the rehabilitation and construction of the weir structures. This project will rehabilitate 4 existing weir structures, one connecting pipeline, replace one complete weir structure (inlet, outlet and connecting pipeline) and install two new complete weir structures. This project will also add a water feature at the replacement weir structure that will enhance the visual aesthetics to the natural surroundings. This project will improve water circulation and water quality as the water passes through the lake system and discharges into the Sycamore Creek and will enhance the environment quality of the Lakes for those bird species that use the Lakes for foraging and nesting. The re-design of the concrete part of the weir structures will also enhance the visual aesthetics of the Lakes.

Contact Information

Name
Jennifer
Agency Name
Padre Dam Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Santee
Counties
San Diego
Cross Streets
Carlton Oaks Boulevard and Fanita Parkway
Zip
92071
Parcel #
380-031-04, 05, 25 and 378-020-15, 49
State Highways
52 and 125
Airports
Gillespie Field
Schools
Elementary School at Settle Road and Canyon View
Waterways
San Diego River and Sycamore Creek

Notice of Determination

Approving Agency
Padre Dam Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.