Harbor-UCLA Medical Center Surgery/Emergency Facility Replacement

2 Documents in Project

Summary

SCH Number
2005061103
Lead Agency
Los Angeles County
Document Title
Harbor-UCLA Medical Center Surgery/Emergency Facility Replacement
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2006
Present Land Use
Hospital and Parking, C3 zone
Document Description
Expansion of the Harbor-UCLA Medical Center through the construction of a new Surgery/Emergency Building addition to the southwest side of the existing hospital. The addition totals 190,300 sf and includes and consists of a two-story building, basement, mechanical penthouse and elevator tower. The existing emergency and surgery department of the hospital would be relocated into the proposed expansion building. The vacated space will be remodeled and used to consolidate and expand other departments. As part of the construction four modular buildings will be demolished, one modular building will be relocated, and two new modular facilities will be installed. The existing ground-level helistop, which has been in use for over 22 years would be moved approximately 45 feet northeast and elevated to 14 feet above ground level. An interim/temporary helistop would be constructed, elevated to 10 feet above grade level, and located on the southwest portion of the medical campus. The project is not present on any lists enumerated under Section 65962.5 of the Government Code, including, but not limited to lists of hazardous waste facilities, land designated as hazardous property, and hazardous waste disposal sites.

Contact Information

Name
Stuart Brehm
Agency Name
Los Angeles County Department of Public Works
Contact Types
Lead/Public Agency

Location

Cities
Carson, Torrance
Counties
Los Angeles
Cross Streets
Vermont Avenue / Carson Street
Total Acres
~ 17
State Highways
SR-213, I-405, and I-110
Railways
UPRR, BNSF
Waterways
Dominguez Channel
Township
4S
Range
14W
Section
Torran

Notice of Determination

Approving Agency
Los Angeles County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print