Farm Shop Storage Building Demolition and Stream Enhancement

4 Documents in Project

Summary

SCH Number
2005061031
Lead Agency
California State University Trustees (California State University Board of Trustees)
Document Title
Farm Shop Storage Building Demolition and Stream Enhancement
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2008
Present Land Use
Campus instructional core

Document Description
SAA #2008-0090-R4 Demolish the existing farm shop storage building and remove a retaining wall that was damaged by an earthquake in December 2002. All rubble and material from the building would be removed and disposed of at an appropriate facility. The left bank of the stream would be graded to a slope of approximately 2:1 (horizontal:vertical) to match the stream characteristics immediately upstream and downstream from the project site. Rock deflector weirs would be installed in the stream to provide in-stream habitat and protect the newly-graded bank.

Contact Information
Mike Hill
California Department of Fish and Game
Central Region 1234 East Shaw Avenue
Fresno, CA 93710

Phone : (805) 594-6141

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Highland Drive / Via Carta
Zip
93407
Total Acres
< 0.1
State Highways
1
Railways
UPRR
Schools
on University campus
Waterways
Brizzolara Creek (on site), Stenner Creek

Notice of Determination

Approving Agency
Claifornia Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
California State University Borad of Trustees Building 70, 1 Grand Avenue, San Luis Obispo, CA 93407

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search