Perris Valley Pipeline Project

8 Documents in Project

Summary

SCH Number
2005061028
Lead Agency
Western Municipal Water District
Document Title
Perris Valley Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2006
Document Description
In a further refinement to the previously approved project, the District proposes to additionally install approximately 13,200 lineal feet of 48-inch diameter CML&C welded steel pipe, fittings, and appurtenances to its distribution system to provide a delivery route for water from the Cactus Avenue Pumping Plant proposed in the FEIR to the District's existing facilities at the intersection of Cactus Avenue and Heacock Street in the City of Moreno Valley. The Cactus Avenue Pipeline would be constructed of 48-inch diameter welded steel pipe designed and constructed to water industry standards. The pipeline would connect to Metropolitan's 96-inch diameter Perris Valley Pipeline that generally extends south-southwest from the Mills Treatment Plant westerly of the I-215 Freeway. The Cactus Avenue Pipeline would begin at the discharge side of the Cactus Pump Station which is located on Lot 68 of the Meridian Development that is approximately 800 feet west of the I-215 Freeway. The alignment would traverse east from the Cactus Pump Station crossing the I-215 Freeway about 800 feet north of the I-215 Freeway/Cactus Avenue Interchange. The alignment would extend across an undeveloped parcel to the existing East Frontage Road that parallels along the east side of the I-215 Freeway, where it would turn south. From this location the alignment would extend south along the west side of the East Frontage Road right-of-way to before reaching Cactus Avenue, and then extend eastward along the south side of Cactus Avenue to its terminus at Heacock Street. The proposed alignment would be approximately 2.5 miles in length.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley, Riverside
Counties
Riverside
Cross Streets
Alessandro Boulevard / I-215
Zip
92518
State Highways
I-215
Railways
BNSF
Airports
March AFB

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.