LAUSD Point Fermin Outdoor Education Center
3 Documents in Project
Summary
SCH Number
2005061027
Lead Agency
Los Angeles Unified School District
Document Title
LAUSD Point Fermin Outdoor Education Center
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2006
Present Land Use
PLU: Vacant, outdoor Education Center
Z: PF-Public Facilities
GPD: Public Facilities
Document Description
The proposed project entails providing year-round, overnight facilities for 160 student/counselor beds at the existing Point Fermin OEC. Currently, the Point Fermin OEC handles 120 student/counselor beds that are housed in tents and operated during the summer. The proposed improvements would include demolition of an existing building (Building No. 852, a historical resource), and construction of two new student dormitories and a residence building for staff and visiting classroom teachers. The proposed project would also include restoration of a brick storage building for indoor activities during poor weather and a residential structure for an onsite naturalist/caretaker staff. The existing outdoor school building will be modified to include an infirmary, and expanded shower and toilet facility, and a new outdoor ecological teaching facility and landscaped area. Additional fencing and security measures, including a fire access road would be provided.
Contact Information
Name
Jessica Rappaport
Agency Name
Los Angeles Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Los Angeles
Counties
Los Angeles
Cross Streets
Leary Miriam Road/Osgood Farley Road
Zip
90731
Total Acres
175
Parcel #
7469018904 or 7469018905
State Highways
Sr-170/I-110
Airports
none
Schools
San Pedro HS
Waterways
Pacific Ocean
Township
5S
Range
14W
Base
SB
Other Location Info
Community: San Pedro
Notice of Determination
Approving Agency
Los Angeles Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.