Fanuel (5253 Cardeno Drive)
Summary
- SCH Number
- 2005059046
- Lead Agency
- City of San Diego
- Document Title
- Fanuel (5253 Cardeno Drive)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/19/2005
- Document Description
- Tentative Map, Planned Infill Residential Development Permit, Resource Protection Ordinance Permit, Community Plan Amendment, and Street Vacation to subdivide a 36,220 sf lot into three separate parcels. Parcel 1 which is currently developed with an existing single-family residence that will remain would be approximately 14,544 sf. Parcel 2 would be approximately 13,777 sf with a new 3,900 sf single-family residence to be built. The areas for parcels 2 and 3 are currently undeveloped and contain disturbed habitat. The remaining portion (excluding the existing driveway) will be vacated (approximately 5,000 sf). A Commercial Plan Amendment is required to allow the lot to be subdivided into three parcels when the underlying residential designation identified in the Pacific Beach Community Plan allows 0-2 dwelling units per acre for the project site.
- Contact Information
-
Anne B. Jarque
City of San Diego
Lead/Public Agency
1222 First Avenue, MS-501
San Diego, CA 92101
Phone : (619) 446-5385
Location
- Cities
- San Diego
- Counties
- San Diego
Notice of Determination
- Approving Agency
- San Diego City Council
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Land Development Review Division City Operations Building 1222 First Avenue, Fifth Floor San Diego, CA 92101
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.