Verizon Wireless Telecommunications Facility Use Permit

Summary

SCH Number
2005058418
Public Agency
Sacramento County
Document Title
Verizon Wireless Telecommunications Facility Use Permit
Document Type
NOE - Notice of Exemption
Received
Posted
5/31/2005
Document Description
The proposed project consists of a Use Permit to allow the collocation of a wireless telecommunications facility on an existing 75-foot high mono-pine cellular tower in the GC zone. The facility will consist of 12 panel type antennas mounted at 58 feet, and the placement of an equipment shelter at the base of the tower.

Contact Information

Name
Joyce Horizumi
Agency Name
Sacramento County Dept. of Environmental Review
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Other Location Info
Community: South Sacramento

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301
Reasons for Exemption
The project consists of the minor addition to an existing structure (placement of antenna arrays on an existing cellular tower) involving negligible or no expansion of use beyond that previously existing and is therefore exempt from the provisions of CEQA.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print