Moller Ranch Project (Project)

11 Documents in Project

Summary

SCH Number
2005052146
Lead Agency
Dublin, City of (City of Dublin)
Document Title
Moller Ranch Project (Project)
Document Type
NOD - Notice of Determination
Received

Document Description
The Project is the construction of a residential development that includes up to 381 single-family detached dwelling units, installation of associated utilities and infrastructure, grading to repair previous landslides in the Project area and to install subdrains, development of trails and parks, construction of a 36-inch diameter storm drain outfall at the Tassajara road culvert, and riparian planting and bank stabilization along the lower portion of Moller Creek. In addition, off-site activities include 8.0 acres of grading to conduct wetland enhancement and creation at the Cayetano Creek Preserve. The Project will result in 206.05 acres of permanent and temporary disturbance to upland grassland refugia habitat for two species listed as threatened under the California Endangered Species Act (CESA): California tiger salamander (Ambystoma californiense) and San Joaquin kit fox (Vulpes macrotis mutica), and is expected to result in take of these species, as defined in Fish and Game Code section 86. To authorize such take, CDFW issued to the Project applicant, an incidental take permit pursuant to CESA (No. 2081-2012-041-03).

Contact Information
Scott Wilson
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

707-944-5500

Location

Cities
Dublin
Counties
Alameda
Cross Streets
Tassajara Road near Fallon Road (future)
Zip
94568
Total Acres
238
Parcel #
985-0001-01 & 02
State Highways
I-580
Railways
No
Airports
No
Schools
Quarry Lane Private School
Waterways
Tassajara Creek & Moller Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW Bay Delta Region, 7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search