Marysville Mining Modification Project
5 Documents in Project
Summary
SCH Number
2005052136
Lead Agency
Yuba County
Document Title
Marysville Mining Modification Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Mining and agriculture
M-2 (Extractive Industrial)
Extractive Industrial
Document Description
The project applicant, Teichert Aggregates ("Teichert"), is proposing alterations to the previously approved Marysville Mining project. The proposed alterations include production capacity increase; alteration of phasing; flexible locations for test plots, overburden stockpiling, and temporary berms; and revisions to current waste discharge requirements (WDRs) for the Teichert aggregate extraction and processing operation. It should be noted that the project site boundary, the designated mining area, and the approved reclamation plan would not change.
Contact Information
Name
Peter Calarco
Agency Name
Yuba County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Marysville
Counties
Yuba
Cross Streets
Hammonton-Smartville Road and Hammonton Road
Total Acres
590
Parcel #
018-017-008 and 018-015-010
Airports
Beale Airforce Base
Township
15N
Range
4 & 5E
Section
7 & 12
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Major Industrial Projects, California Department of Conservation (DOC), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Department of Water Resources, Resources Agency, California Department of Transportation, District 3 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 3 (DOT)
Development Types
Mining (Mineral Aggregate)
Local Actions
Amendment to Surface Mining Permit
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.