Franklin - Elk Grove Neighborhood Electric Distribution Project

3 Documents in Project

Summary

SCH Number
2005052064
Lead Agency
Sacramento Municipal Utility District
Document Title
Franklin - Elk Grove Neighborhood Electric Distribution Project
Document Type
NOD - Notice of Determination
Received
Posted
9/2/2005
Present Land Use
The site is designated Mixed Use: Commercial/Office/Multi-Family (C/O/MF) according to the City of Elk Grove General Plan Land Use Policy Map. The site is designated Single Family Residential, 3 to 6 dwelling units per acre according to the East Franklin Specific Plan. The zoning district, according to the City of Elk Grove General Plan is C/O/MF. The City's Zoning Map Sheet 10 indicates that the site is zoned AG-20 (Agriculture, 20-acre minimum). A Specific Plan Amendment to rezone the AG-20-zoned site to Mixed Commercial: SC Shopping Center Zone was approved in 2002.
Document Description
SMUD proposes to construct and operate a distribution substation and 69 kV subtransmission line that would be added to the SMUD electrical system. The main project features include: - Two 69 kV power transformers - Six capacitor banks - Two station battery banks - Metal clad switchgear - Two switch poles - 235-foot-long 69 kV overhead subtransmission power line along the north side of the substation

Contact Information

Name
Ron Scott
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Elk Grove Boulevard / Franklin Boulevard
Total Acres
0.4
Parcel #
132-0020-171
State Highways
1.8 mi. east of I-5
Railways
1,200 ft. east of UPRR tracks
Township
6N
Range
5E
Section
5
Base
MDBM

Notice of Determination

Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes