Mecca 18-Inch Sewer Force Main

2 Documents in Project

Summary

SCH Number
2005051070
Lead Agency
Coachella Valley Water District (CVWD)
Document Title
Mecca 18-Inch Sewer Force Main
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2005
Present Land Use
Rural Residential, County Road, State Highway, Agricultural GP: The project is adjacent to Rural Residential, Agricultural, Commercial Retail, Very High Density Residential
Document Description
An 18" sewer force main will be constructed adjacent to an existing 10" sewer force main between Lift Station 55-11 in Mecca and Water Reclamation Plant 4 (WRP-4) in Thermal. The new sewer line, approximately 4 miles long, will be installed along a small portion of State Route 111, crossing State Route 86, following the road shoulder of Avenue 66 (State Route 195) in a westerly direction and then turning northwest along the western dike (bank) of the Coachella Valley Stormwater Channel where it will connect ot WRP 4. The purpose of the project is to improve sewer service and capacity in the vicinity of the project by upgrading the size of the sewer force main.

Contact Information

Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
State Hwy. 111 / Avenue 66
Zip
92274
Total Acres
1.00
State Highways
86, 111, 195
Railways
UPRR
Waterways
Coachella Valley Stormwater Channel
Township
7S
Range
9E
Section
2, 7,
Base
SB
Other Location Info
Mecca / Thermal
Other Information
Section: 8, 12

Notice of Determination

Approving Agency
Coachella Valley Water District Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.