Mission Springs Water District's Painted Hills Water System Renovation Project
2 Documents in Project
Summary
SCH Number
2005051062
Lead Agency
Mission Springs Water District
Document Title
Mission Springs Water District's Painted Hills Water System Renovation Project
Document Type
NEG - Negative Declaration
Received
Document Description
New development has been approved and is being constructed in MSWD's Gateway Reservoir (1530) Pressure Zone. The approved developments will require additional water availability in the Gateway Pressure Zone. The proposed project will move water supplies to the Gateway Reservoir via the existing Overhill and Valley View Reservoirs, two new booster stations at each of these reservoirs, and new and existing pipeline infrastructure will be used to transport water.
The Valley View Booster Station will be located at the existing Valley View Reservoir on APN 668-212-013 along Valley View Drive. The Overhill Booster Station will be located at the existing Overhill Reservoir along Hilltop Road on APN 668-040-010. Both booster stations will be located within existing fenced MSWD compounds. The Gateway Reservoir is located in Section 32 of T2S, R4E, SBM as shown on the USGS - Desert Hot Springs Quadrangle, 7.5 Minute Series topographic. The Overhill Reservoir is located in Section 6 of T3S, R4E, SBM as shown on the USGS - Desert Hot Springs Quadrangle, 7.5 Minute Series topographic. The Valley View Reservoir is located in Section 5 of T3S, R4E, SBM as shown on the USGS - Desert Hot Springs Quadrangle, 7.5 Minute Series topographic. A new water pipeline will be located in Salton View Road between the Overhill and Gateway reservoirs.
Contact Information
Name
Milagros Wallace
Agency Name
Mission Springs Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Desert Hot Springs
Counties
Riverside
Cross Streets
Pipeline will be located w/in ROW of Pierson Road State Highway 62 and Little Morongo Road
Parcel #
688-212-013; 668-040-010
State Highways
62
Township
2, 3S
Range
4E
Section
5, 6,
Base
SBM
Other Information
Section: 32
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Colorado River Basin Region 7 (RWQCB), Department of Fish and Wildlife, Region 6, Department of Water Resources, Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Department of Health Care Services (DHCS)
State Reviewing Agency Comments
California Department of Health Care Services (DHCS)
Development Types
Other (Water System Renovation)
Local Actions
Water System Renovation
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Schools/Universities, Septic System, Sewer Capacity, Social, Solid Waste, Transportation, Vegetation, Wildfire, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.