I-5/SR-56 Freeway Interchange Project

5 Documents in Project

Summary

SCH Number
2005051061
Lead Agency
California Department of Transportation, District 11
Document Title
I-5/SR-56 Freeway Interchange Project
Document Type
EIR - Draft EIR
Received
Present Land Use
The majority of the land surrounding the study area is either developed and urban or preserved as open space. The study area is subject to the City of San Diego General Plan, community plans within the study area and any applicable bicycle and pedestrian plans.
Document Description
Note: Review Extended Per Lead The proposed project would improve the movement of vehicles traveling westbound on SR-56 to northbound I-5, and vehicles traveling southbound on I-5 to eastbound SR-56. The proposed I-5/SR-56 interchange project would begin south of the western segment of Carmel Valley Road along I-5 at post mile (PM) 32.7 and continue to PM 34.8 north of Del Mar Heights Road. Along SR-56, the proposed project would begin at PM 0.0 at El Camino Real and continue to PM 2.5 east of Carmel Country Road. The length of the proposed project is approximately 2.1 miles on I-5 and approximately 2.5 miles on SR-56, for a collective length of 4.6 miles. The project includes five alternatives including: Alternative 1 (No Build), Alternative 2 (Direct Connector), Alternative 3 (Auxiliary Lane), Alternative 4 (Hybrid), and Alternative 5 (Hybrid with Flyover).

Contact Information

Name
Shay Lynn M. Harrison
Agency Name
Department of Transportation, District 11
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
I-5/SR 56 Interchange
Zip
92130
Total Acres
242
State Highways
No
Railways
San Diego Northern
Airports
No
Schools
Yes
Waterways
Pacific Ocean, San Dieguito River, Carmel Valley Creek
Township
14S
Range
3/4W
Section
13/16
Other Information
Section Cont.: 19, 20, 21, 24, 25, 30

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Coastal Commission (CCC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), Department of Water Resources, Resources Agency, California Native American Heritage Commission (NAHC), Department of Toxic Substances Control
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), Department of Toxic Substances Control
Development Types
Transportation:Highway/Freeway (Interstate/State interchange)
Project Issues
Air Quality, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Land Use/Planning, Noise, Recreation, Transportation, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print