Pacific Palms Offsite Recycled Water Pipeline

3 Documents in Project

Summary

SCH Number
2005051019
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Pacific Palms Offsite Recycled Water Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2005
Present Land Use
Residential, Open Space Recreation, Commercial Retail / Sun City / Menifee Valley Area Plan
Document Description
The proposed project consists of the construction of approximately 6,870 lineal feet of 12 and 18-inch diameter recycled water transmission pipeline within the paved right-of-ways of La Piedra and Bradley Roads. The 12-inch diameter pipeline will follow along the north side of La Piedra Road within the paved right-of-way from Winter Hawk Road easterly to Bradley Road; thence the 18-inch diameter pipeline will follow along the east side of Bradley Road within the paved right-of-way northerly to its termination point approximately 100 feet south of Potomac Drive. The Salt Creek Channel crossing will be within the paved section of Bradley Road with no resulting disturbance to the channel itself.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Various
Zip
92584
Parcel #
Various
State Highways
215
Schools
Menifee USD
Waterways
Salt Creek Channel
Township
5, 6S
Range
3W
Section
33, 4
Base
SBBM
Other Location Info
Menifee

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print