California State Univeristy Northridge, Certify the Final EIR and Approve the Campus Master Plan Revision with Enrollment Ceiling Increase

9 Documents in Project

Summary

SCH Number
2005051008
Lead Agency
California State University, Northridge (CSUN)
Document Title
California State Univeristy Northridge, Certify the Final EIR and Approve the Campus Master Plan Revision with Enrollment Ceiling Increase
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2006
Present Land Use
Public Facility (PF) Land Use / Public Facility Zone / University
Document Description
This proposed project is for the east portion of the main campus, immediately east of the Student Health Center and Chisholm Hall. The project will be constructed over an existing surface parking lot to provide 1,449 new spaces (1,463 spaces in the structure and 36 surface parking spaces), increasing the campus inventory by a net of 1,090 spaces. The structure will have five levels including roof level parking. Vehicle entries and exits are located to minimize vehicular traffic within the campus, avoid vehicle/pedestrian conflicts, and provide for optimal pedestrian flow onto campus walks and promenades. The design focuses on security and safety in and around the structure as exemplified by the open floor plans, exterior stairs and elevator placement.

Contact Information

Name
David A. Rosso
Agency Name
Trustees of the California State University
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Nordhoff Street and Zelzah Avenue
Total Acres
353
State Highways
118
Schools
Northridge Academy HS
Other Location Info
Community: Northridge

Notice of Determination

Approving Agency
Trustees of the University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.