California State Univeristy Northridge, Certify the Final EIR and Approve the Campus Master Plan Revision with Enrollment Ceiling Increase

9 Documents in Project

Summary

SCH Number
2005051008
Lead Agency
California State University, Northridge (CSUN)
Document Title
California State Univeristy Northridge, Certify the Final EIR and Approve the Campus Master Plan Revision with Enrollment Ceiling Increase
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2006
Present Land Use
Public Facility (PF) Land Use / Public Facility Zone / University
Document Description
This project is based on the projected master plan enrollment of 35,000 FTE over the next 30 years. It will provide sites for 1.9 million GSF of future academic and support buildings in order to accommodate the proposed 35,000 FTE enrollment ceiling. Approximately 360,000 GSF of existing campus buildings will be replaced as those facilities exceed their useful service life, providing for more efficient use of campus land and allowing for sustainable growth. The first phase of the development is identified by the three near term projects that have been analyzed in the FEIR at a construction level: (1) Performing Arts Center, a 1630 GSF complex for the College of Arts, Media and Communication; (2) Parking Structure PS-G3, a 648,000 GSF facility providing 1,994 spaces; and (3) the Transit Center, a centrally located mass transit hub for students, faculty, staff and community members traveling to the campus.

Contact Information

Name
Colin Donahue
Agency Name
California State University, Northridge
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Nordhoff Street and Zelzah Avenue
Total Acres
353
State Highways
118
Schools
Northridge Academy HS
Other Location Info
Community: Northridge

Notice of Determination

Approving Agency
Trustees of the University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print