Document Description
The plan will implement road recontouring on approximately 93 miles of abandoned unstable inner-gorge, mid-slope and ridge top service and skid roads within the Mill Creek Watersheds. The work will include excavation of embankment fill from roads and stabilization of excavated materials on cutbench to fully recontour natural (pre-disturbance) topography. All of the roads proposed for treatment under this plan are currently impassable and could not serve as part of a transportation network. The project also includes removal of fill material from 351 stream crossings associated with the service and skid roads described above. The majority of the crossings will have no flow during the proposed construction season and are typically small fill crossings. Most of the crossings are already partially removed and many are actively failing. Stream crossings removal will include road cut slopes and recontouring to match the natural slopes will stabilize the crossings. Stream channel bed, banks, and adjacent slopes will be restored to their pre-crossing configuration. Longitudinal stream gradient will be reestablished through the crossing site.
Contact Information
Name
John E. Harris
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency
Phone
Location
Cities
Crescent City
Counties
Del Norte
Cross Streets
Highway 101 / Hamilton Road
Zip
95531
State Highways
US 101
Waterways
Mill Creek, Rock Creek, Wilson Creek, Hunter Creek, Turwar Creek, Last Chance Creek, streams
Notice of Determination
Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA