Fiddler Green
7 Documents in Project
Summary
SCH Number
2005042135
Lead Agency
Placer County
Document Title
Fiddler Green
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2007
Present Land Use
The vacant site is the location of the former Bohemia Lumber Company. A small portion was formerly owned by PG&E. Evidence of the prior use have been removed, except for concrete slab foundations, paved and gravel surfaces and two bridges across the Wise and Fiddler Green canals.
Z and GP: The majority of the project site is designated by the Placer County General Plan as Commercial, which allows for attached residential units and is zoned CPD-DC-AO, Commercial Planned Development, with Design Corridor, and with Aircraft Overflight. The former PG&E property is designated as Industrial and INP-DC-AO, Industrial Park with Design Corridor, and with Aircraft Overflight. The Auburn-Bowman Community Plan provides additional planning goal and policies. The proposed development is not consistent with permitted uses under these designations. Thus, a Zoning Code Amendment is necessary to allow medium density residential units to be detached in the CPD zone.
Document Description
Proposes the redevelopment of the former Bohemia Lumber Company site into a residential community consisting of 114 residential parcels containing detached single-family homes.
Contact Information
Name
Maywan Krach
Agency Name
Placer County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Auburn
Counties
Placer
Cross Streets
Canal Street / Luther Road
Total Acres
18.5
Parcel #
53-102-12, 13, 17, and a portion of 53-102-25
Waterways
Wise Canal and Fiddler Green Canal
Township
12N
Range
8E
Section
23
Notice of Determination
Approving Agency
Placer County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.