Leo Wilson - MS0535C - Minor Subdivision

2 Documents in Project

Summary

SCH Number
2005042118
Lead Agency
Del Norte County
Document Title
Leo Wilson - MS0535C - Minor Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2005
Present Land Use
Developed with one residence. GP: RR (1/1) (Rural Residential - one dwelling unit per acre) Z: RRA-1 (Rural Residential Agriculture - one acre minimum lot size)
Document Description
Minor Subdivision of a 5.86-acre parcel into two parcels approximately 1.0 acre and 4.86 acres in size. The parcel has a General Plan Land Use designation of RR(1/1) (Rural Residential - one dwelling unit per acre) and a Zone designation of RRA-1 (Rural Residential Agriculture - one acre minimum lot size). The parcel is developed with a single-family residence that is served with an existing on-site sewage disposal system and private well. The proposed undeveloped parcel will utilize a separate private well and on-site sewage disposal system.

Contact Information

Name
Heidi Kunstal, Ernie Perry, Randy Hooper
Agency Name
Del Norte County Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Crescent City
Counties
Del Norte
Cross Streets
W. Alder Road and Lake Earl Drive
Zip
95531
Total Acres
5.86
Parcel #
110-150-42
State Highways
101
Schools
Pine Grove, Sunset School
Waterways
Jordan Creek, Lake Earl, Pacific Ocean
Township
16N
Range
1W
Section
3, 4
Base
HBM

Notice of Determination

Approving Agency
Del Norte County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print